Matter No. 0171
Title Point  Lepreau  Nuclear  Generating  Station  Deferral  Account
Description Electricity
Summary IN  THE  MATTER  OF  the  Point  Lepreau  Nuclear  Generating  Station  Deferral  Account  and  section  143.1  of  the  Electricity  Act
Status Closed
Decisions
Date Title
03/13/2013 Decision Item A and Item B
03/18/2013 Décision - enjeu A et enjeu B
01/13/2014 Decision Item C and Item D
01/13/2014 Décision - enjeu C et enjeu D
Exhibits
Exhibit  No Producing  Party Title
NBPD1.01 NBPD Board  Order  -  English
NBPD1.02 NBPD Ordonnance  -  Français
NBPD1.03 NBPD Introduction,  Deferral  Account  Balance,  Governance  oversight  -  English
NBPD1.04 NBPD Introduction,  solde  de  compte  de  report,  gouvernance  et  surveillance  -  Français
NBPD1.05 NBPD Attachment  A  -  English  /  Detailed  explanation  of  Nuclear  Non  Capital  Cost
NBPD1.06 NBPD Pièce  jointe  A  -  Français  /  Explication  Détaillée  des  Coûts  Liés  aux  Immobilisations
NBPD1.07 NBPD Appendix  A  -  1  Balance  in  deferral  Account  Monthly  Spreadsheet
NBPD1.08 NBPD Appendix  A  -  2  Nuclear/Genco  Cost  and  Offset  Monthly  spreadsheet
NBPD1.09 NBPD Appendix  A  -  3  Monthly  Genco  Billing  and  Lepreau  Offset  summary
NBPD1.10 NBPD Appendix  A  -  4  Reconcilliation  of  Deferral  Balance  after  June  2012  adjustment
NBPD1.11 NBPD Appendix  B  -  1  Nuclear  invoices  and  support  docs  March  2008  and  Fiscal  2008-09
NBPD1.12 NBPD Appendix  B  -  2  Nuclear  invoices  and  support  docs  Fiscal  2009-10
NBPD1.13 NBPD Appendix  B  -  3  Nuclear  invoices  and  support  docs  Fiscal  2010-11
NBPD1.14 NBPD Appendix  B  -  4  Nuclear  invoices  and  support  docs  Fiscal  2011-12
NBPD1.15 NBPD Appendix  B  -  5  Genco  Additional  costs  -  Invoice  and  Worksheet  summary
NBPD1.16 NBPD Appendix  B  -  6  Genco  Invoices  and  support  docs  March  2008  and  Fiscal  2008-09
NBPD1.17 NBPD Appendix  B  -  7  Genco  invoices  and  support  docs  Fiscal  2009-10
NBPD1.18 NBPD Appendix  B  -  8  Genco  invoices  and  support  docs  Fiscal  2010-11
NBPD1.19 NBPD Appendix  B  -  9  Genco  invoices  and  support  docs  Fiscal  2011-12
NBPD1.20 NBPD Appendix  C  -  1  Deloitte  &  Touche  LLP  Review
NBPD1.21 NBPD Appendix  C  -  2  Ernst  &  Young  Review
NBPD1.22 NBPD Appendix  C  -  3  Technical  Audit  of  TTS  System
NBPD1.23 NBPD Appendix  D  -  1  Vesting  Operating  Committee  meeting  minutes
NBPD1.24 NBPD Appendix  D  -  2  Lepreau  Operating  Committee  meeting  minutes
NBPD1.25 NBPD Appendix  D  -  3  Audit  Committee  Board  of  Directors  reports
NBPD1.26 NBPD Appendix  E  -  1  Regulation  2012-58  Electricity  Act
NBPD1.27 NBPD Appendix  F  -  1  Deloitte  &  touche  LLP  Scope  of  Services
NBPD1.28 NBPD Appendix  G  -  1  Teed  Saunders  Doyle  report  of  July  6,  2012
NBPD2.01 NBPD Report  of  James  Sustman  "Audit  of  the  Determination  of  Replacement  Power  Costs  Related  to  the  Refurbishment  of  the  Point  Lepreau  Generating  Station
NBPD2.01C NBPD Confidential  Responses  to  IRs  of  NBPD
NBPD3.01 NBPD Evidence  -  Projected  Operating  Life  -    Introduction,  Executive  Summary  -  English
NBPD3.02 NBPD Preuve  -  durée  de  vie  prévue  -    Introduction,  Résumé  -  Français
NBPD3.03 NBPD Evidence  -  Projected  Operating  Life  -    Candu6  Equipment  Design  Life,  PLGS  Operating  Plan  -  English
NBPD3.04 NBPD Preuve  -  durée  de  vie  prévue  -    Cycle  de  vie  nominale  de  l'équipement  Candu6,  Plan  d'exploitation  de  la  centrale  de  Point  Lepreau  Plan  -  Français
NBPD3.05 NBPD Evidence  -  Projected  Operating  Life  -    PLGS  Plant  Life  Management,  PLGS  Oversight,  Attachment  1  -  English
NBPD3.06 NBPD Preuve  -  durée  de  vie  prévue  -    Gestion  de  la  durée  de  vie  de  la  centrale  de  Point  Lepreau,  Surveillance  de  la  centrale,  pièce  jointe  1  -  Français
NBPD3.07 NBPD Evidence  -  Projected  Operating  Life  -    Appendix  A  -  1,  Letter  from  AECL  dated  October  4,  2012
NBPD4.01 NBPD Responses  to  IRs  of  the  Energy  and  Utilities  Board  ("EUB")  IRs  1-18
NBPD4.02 NBPD Appendix  A  -  EUB  IR-2  -  Vesting  PPA
NBPD4.03 NBPD Appendix  BI  -  EUB  IR-2  -  Amendment  1  to  Vesting  PPA
NBPD4.04 NBPD Appendix  B2  -  EUB  IR-2  -  Amendment  2  to  Vesting  PPA
NBPD4.05 NBPD Appendix  B3  -  EUB  IR-2  -  Amendment  3  to  Vesting  PPA
NBPD4.06 NBPD Appendix  B4  -  EUB  IR-2  -  Amendment  4  to  Vesting  PPA
NBPD4.07 NBPD Appendix  B5  -  EUB  IR2-  Amendment  5  to  Vesting  PPA
NBPD4.08 NBPD Appendix  B6  -  EUB  IR-2  -  Amendment  6  to  Vesting  PPA
NBPD4.09 NBPD Appendix  C  -  EUB  IR-9  -  Condition  Assessment  2002
NBPD4.10 NBPD Appendix  D  -  EUB  IR-14  -  Fiscal  Year  2008  Quarterly  Operating  Report
NBPD4.11 NBPD Appendix  E  -  EUB  IR-14  -  Fiscal  Year  2009  Quarterly  Operating  Report
NBPD4.12 NBPD Appendix  E  -  EUB  IR-14  -  Fiscal  Year  2010  Quarterly  Operating  Report
NBPD4.13 NBPD Appendix  G  -  EUB  IR-14  -  Fiscal  Year  2011  Quarterly  Operating  Report
NBPD4.14 NBPD Appendix  H  -  EUB  IR-14  -  Fiscal  Year  2012  Quarterly  Operating  Report
NBPD4.15 NBPD Appendix  I  -  EUB  IR-14  -  Fiscal  Year  2013  Quarterly  Operating  Report
NBPD4.16 NBPD Appendix  J  -  EUB  IR-16  -  System  Health  Report  Summary  and  Flow  Charts
NBPD4.17 NBPD Appendix  J1  -  EUB  IR-16  -  System  Health  Monitoring  Report  1
NBPD4.18 NBPD Appendix  J2  -  EUB  IR-16  -  System  Health  Monitoring  Report  2
NBPD4.19 NBPD Appendix  J3  -  EUB  IR-16  -  System  Health  Monitoring  Report  3
NBPD4.20 NBPD Appendix  J4  -  EUB  IR-16  -  System  Health  Monitoring  Report  4
NBPD4.21 NBPD Appendix  J5  -  EUB  IR-16  -  System  Health  Monitoring  Report  5
NBPD4.22 NBPD Appendix  J6  -  EUB  IR-16  -  System  Health  Monitoring  Report  6
NBPD4.23 NBPD Appendix  J7  -  EUB  IR-16  -  System  Health  Monitoring  Report  7
NBPD4.24 NBPD Appendix  J8  -  EUB  IR-16  -  System  Health  Monitoring  Report  8
NBPD4.25 NBPD Appendix  J9  -  EUB  IR-16  -  System  Health  Monitoring  Report  9
NBPD4.26 NBPD Appendix  J10  -  EUB  IR-16  -  System  Health  Monitoring  Report  10
NBPD4.27 NBPD Appendix  J11  -  EUB  IR-16  -  System  Health  Monitoring  Report  11
NBPD4.28 NBPD Appendix  J12  -  EUB  IR-16  -  System  Health  Monitoring  Report  12
NBPD4.29 NBPD Appendix  J13  -  EUB  IR-16  -  System  Health  Monitoring  Report  13
NBPD4.30 NBPD Appendix  J14  -  EUB  IR-16  -  System  Health  Monitoring  Report  14
NBPD4.31 NBPD Appendix  J15  -  EUB  IR-16  -  System  Health  Monitoring  Report  15
NBPD4.32 NBPD Appendix  J16  -  EUB  IR-16  -  System  Health  Monitoring  Report  16
NBPD4.33 NBPD Appendix  J17  -  EUB  IR-16  -  System  Health  Monitoring  Report  17
NBPD4.34 NBPD Appendix  J18  -  EUB  IR-16  -  System  Health  Monitoring  Report  18
NBPD4.35 NBPD Appendix  J19  -  EUB  IR-16  -  System  Health  Monitoring  Report  19
NBPD4.36 NBPD Appendix  J20  -  EUB  IR-16  -  System  Health  Monitoring  Report  20
NBPD4.37 NBPD Appendix  J21  -  EUB  IR-16  -  System  Health  Monitoring  Report  21
NBPD4.38 NBPD Appendix  J22  -  EUB  IR-16  -  System  Health  Monitoring  Report  22
NBPD4.39 NBPD Appendix  J23  -  EUB  IR-16  -  System  Health  Monitoring  Report  23
NBPD4.40 NBPD Appendix  J24  -  EUB  IR-16  -  System  Health  Monitoring  Report  24
NBPD4.41 NBPD Appendix  J25  -  EUB  IR-16  -  System  Health  Monitoring  Report  25
NBPD4.42 NBPD Appendix  J26  -  EUB  IR-16  -  System  Health  Monitoring  Report  26
NBPD4.43 NBPD Appendix  J27  -  EUB  IR-16  -  System  Health  Monitoring  Report  27
NBPD4.44 NBPD Appendix  J28  -  EUB  IR-16  -  System  Health  Monitoring  Report  28
NBPD4.45 NBPD Appendix  J29  -  EUB  IR-16  -  System  Health  Monitoring  Report  29
NBPD4.46 NBPD Appendix  J30  -  EUB  IR-16  -  System  Health  Monitoring  Report  30
NBPD4.47 NBPD Appendix  J31  -  EUB  IR-16  -  System  Health  Monitoring  Report  31
NBPD4.48 NBPD Appendix  J32  -  EUB  IR-16  -  System  Health  Monitoring  Report  32
NBPD4.49 NBPD Appendix  J33  -  EUB  IR-16  -  System  Health  Monitoring  Report  33
NBPD4.50 NBPD Appendix  J34  -  EUB  IR-16  -  System  Health  Monitoring  Report  34
NBPD4.51 NBPD Appendix  J35  -  EUB  IR-16  -  System  Health  Monitoring  Report  35
NBPD4.52 NBPD Appendix  J36  -  EUB  IR-16  -  System  Health  Monitoring  Report  36
NBPD4.53 NBPD Appendix  J37  -  EUB  IR-16  -  System  Health  Monitoring  Report  37
NBPD4.54 NBPD Appendix  J38  -  EUB  IR-16  -  System  Health  Monitoring  Report  38
NBPD4.55 NBPD Appendix  J39  -  EUB  IR-16  -  System  Health  Monitoring  Report  39
NBPD4.56 NBPD Appendix  J40  -  EUB  IR-16  -  System  Health  Monitoring  Report  40
NBPD4.57 NBPD Appendix  J41  -  EUB  IR-16  -  System  Health  Monitoring  Report  41
NBPD4.58 NBPD Appendix  J42  -  EUB  IR-16  -  System  Health  Monitoring  Report  42
NBPD4.59 NBPD Appendix  J43  -  EUB  IR-16  -  System  Health  Monitoring  Report  43
NBPD4.60 NBPD Appendix  J44  -  EUB  IR-16  -  System  Health  Monitoring  Report  44
NBPD4.61 NBPD Appendix  J45  -  EUB  IR-16  -  System  Health  Monitoring  Report  45
NBPD4.62 NBPD Appendix  J46  -  EUB  IR-16  -  System  Health  Monitoring  Report  46
NBPD4.63 NBPD Appendix  J47  -  EUB  IR-16  -  Preoperational  and  system  readiness  1
NBPD4.64 NBPD Appendix  J48  -  EUB  IR-16  -  Preoperational  and  system  readiness  2
NBPD4.65 NBPD Appendix  J49  -  EUB  IR-16  -  Preoperational  and  system  readiness  3
NBPD4.66 NBPD Appendix  J50  -  EUB  IR-16  -  Preoperational  and  system  readiness  4
NBPD4.67 NBPD Appendix  J51  -  EUB  IR-16  -  Preoperational  and  system  readiness  5
NBPD4.68 NBPD Appendix  J52  -  EUB  IR-16  -  Preoperational  and  system  readiness  6
NBPD4.69 NBPD Appendix  J53  -  EUB  IR-16  -  Preoperational  and  system  readiness  7
NBPD4.70 NBPD Appendix  J54  -  EUB  IR-16  -  Preoperational  and  system  readiness  8
NBPD4.71 NBPD Appendix  J55  -  EUB  IR-16  -  Preoperational  and  system  readiness  9
NBPD4.72 NBPD Appendix  J56  -  EUB  IR-16  -  Preoperational  and  system  readiness10
NBPD4.73 NBPD Appendix  K  -  EUB  IR-17  -  Amortization  Review  Committee  Reports  2004-2-11
NBPD4.74 NBPD Responses  to  IRs  of  the    Public  Intervenor  ("PI")  IRs  1-22
NBPD4.75 NBPD Appendix  L1  -  PI  IR-2  -  Capitalization  Assets  Policy
NBPD4.76 NBPD Appendix  L2  -  PI  IR-2  -  Classification  of  Expenditures  Policy
NBPD4.77 NBPD Appendix  M  -  PI  IR-3  -  Generation  Connection  Agreement
NBPD4.78C NBPD Confidential  -  Appendix  N  -  PI  IR-3  -  Participation  Agreement
NBPD4.79 NBPD Appendix  O  -  PI  IR-4  -  Deferral  Interest  Rate  Analysis
NBPD4.80 NBPD Appendix  P  -  PI  IR-4  -  Exhibit  1.07  Nuclearco  and  Genco  costs  Revised
NBPD4.81 NBPD Appendix  Q  -  PI  IR-5  a  (ii)  -  Purchased  Power  &  Fuel  Costs
NBPD4.82 NBPD Appendix  Q1  -  PI  IR-5a(viii),  5a(ix),  5a(xi),  5a(xiii)  -  OMA  &  other
NBPD4.83 NBPD Appendix  Q2  -  PI  IR-5b  -  Exhibit  1.09  Expanded
NBPD4.84 NBPD Appendix  R  -  PI  IR-8  -  Deloitte  Opinion
NBPD4.85 NBPD Appendix  S1  -  PI  IR-8  -  Redacted  Coleson  Cove  Tolling  Agreement
NBPD4.86 NBPD Appendix  Y  -  PI  IR-11  -  Detailed  Ammortization  &  Decommissioning  Costs
NBPD4.87 NBPD Appendix  S2  -  PI  IR-8  -  Amendment  1  to  Coleson  Cove  Tolling  Agreement
NBPD4.88 NBPD Appendix  S3  -  PI  IR-8  -  Redacted  Nuclearco  PPA
NBPD4.89C NBPD Blank  Space
NBPD4.90C NBPD Confidential  Appendix  T1  -  PI  IR-8  -  2008-09  PROMOD  Input/Output
NBPD4.91C NBPD Confidential  Appendis  T2  -  PI  IR-8  -  2009-10  PROMOD  Input/Output
NBPD4.92C NBPD Confidential  Appendix  T-3  -  PI  IR-8  -  2010-11  PROMOD  Input/Output
NBPD4.93C NBPD Confidential  Appendix  T4  -  PI  IR-8  -  2011-12  PROMOD  Input/Output
NBPD4.94C NBPD Confidential  Appendix  T5  -  PI  IR-8  -  2012-13  PROMOD  Input/Output
NBPD4.95C NBPD Confidential  Appendix  U1  -  PI  IR-8f,  8g,  8h  -  Aug  08  Lepreau  Non-Refurbishment  2008-08-13  hour  08  on  2008-12-17  (With  Lepreau)
NBPD4.96C NBPD Confidential  Appendix  U2  -  PI  IR-8f,  8g,  8h  -  Aug  2008  TSS  Data  (Updated  2009-01-20)
NBPD4.97C NBPD Confidential  Appendix  U3  -  PI  IR-8f,  8g,  8h  -  Aug  2008  TSS  Data
NBPD4.98C NBPD Confidential  Appendix  U4  -  PI  IR-8f,  8g,  8h  -  Dec  2008  TSS  Data  2-11-2009
NBPD4.99C NBPD Confidential  Appendix  U5  -  PI  IR-8f,  8g,  8h  -  Dec  2008  TSS  Data  2-13-2009
NBPD5.01C NBPD Confidential  Appendix  U6  -  PI  IR-8f,  8g,  8h  -  Deferral  Account  Calculation  April  2008
NBPD5.02C NBPD Confidential  Appendix  U7  -  PI  IR-8f,  8g,  8h  -  Deferral  Account  Calculation  Aug  2008
NBPD5.03C NBPD Confidential  Appendix  U8  -  PI  IR-8f,  8g,  8h  -  Deferral  Account  Calculation  July  2008
NBPD5.04C NBPD Confidential  Appendix  U9  -  PI  IR-8f,  8g,  8h  -  Deferral  Account  Calculation  June  2008
NBPD5.05C NBPD Confidential  Appendix  U10  -  PI  IR-8f,  8g,  8h  -  Deferral  Account  Calculation  March  2008
NBPD5.06C NBPD Confidential  Appendix  U11  -  PI  IR-8f,  8g,  8h  -  Deferral  Account  Calculation  May  2008
NBPD5.07C NBPD Confidential  Appendix  U12  -  PI  IR-8f,  8g,  8h  -  Deferral  Account  Calculation  September  2008
NBPD5.08C NBPD Confidential  Appendix  U13  -  PI  IR-8f,  8g,  8h  -  DOC  101512a  (Technical  clarification)
NBPD5.09C NBPD Confidential  Appendix  U14  -  PI  IR-8f,  8g,  8h  -  DOC101512b  (Technical  clarification)
NBPD5.10C NBPD Confidential  Appendix  U15  -  PI  IR-8f,  8g,  8h  -  DOC101512c  (Technical  clarification
NBPD5.11C NBPD Confidential  Appendix  U16  -  PI  IR-8f,  8g,  8h  -  DOC101512d  (Technical  clarification)
NBPD5.12C NBPD Confidential  Appendix  U17  -  PI  IR-8f,  8g,  8h  -  DOC101512e  (Technical  Clarification
NBPD5.13C NBPD Confidential  Appendix  U18  -  PI  IR-8f,  8g,  8h  -  Point  Lepreau  Capacity  for  Deferral  Account
NBPD5.14C NBPD Confidential  Appendix  U19  -  PI  IR-8f,  8g,  8h  -  Point  Lepreau  Deferral  (Aug  2008)
NBPD5.15C NBPD Appendix  U20  -  PI  IR-8f,  8g,  8f  -  Run  2008-08-02  hour  00  on  2008-12-17  (without  Lepreau)
NBPD5.16C NBPD Confidential  Appendix  U21  -  PI  IR-8f,  8g,  8h  -  Run  Aug  08  costing  2008-08-01  hour  00  on  2008-12-17  (without  Lepreau)
NBPD5.17C NBPD Confidential  Appendix  U22  -  PI  IR-8f,  8g,  8h  -  Run  Aug  08  Costing  2008-08-02  hour  01  on  2008-12-17  (without  Lepreau)
NBPD5.18C NBPD Confidential  U23  -  PI  IR-8f,  8g,  8h  -  Run  Aug  08  costing  2008-08-10  hour  02  on  2008-12-17  (without  Lepreau)
NBPD5.19C NBPD Confidential  Appendis  U24  -  PI  IR-8f,  8g,  8h  -  Run  Aug  08  costing  2008-08-13  hour  08  on  2008-12-17  (without  Lepreau)
NBPD5.20C NBPD Confidential  Appendix  U25  -  PI  IR-8f,  8g,  8h  -  Run  Aug  08  Lepreau  Non-Refurbishment  2008-08-02  hour  00  on  2008-12-17  (with  Lepreau)
NBPD5.21C NBPD Confidential  Appendix  U26  -  PI  IR-8f,  8g,  8h  -  Run  Aug  08  Lepreau  Non-Refurbishment  2008-08-02  hour  01  on  2008-12-17  (With  Lepreau)
NBPD5.22C NBPD Confidential  Appendix  U27  -  PI  IR-8f,  8g,  8h  -  Aug  08  Lepreau  Non-Refurbishment  2008-08-10  hour  02  on  2008-12-17  (with  Lepreau)
NBPD5.23C NBPD Confidential  Appendix  U28  -  PI  IR-8f,  8g,  8h  -  Run  Aug  08  Lepreau  Non-Refurbishment  2008-08-01  hour  00  2008-12-17  (with  Lepreau)
NBPD5.24C NBPD Confidential  Appendix  U29  -  PI  IR-8f,  8g,  8h  -  Run  Dec  08  costing  2008-12-06  hour  02  on  2009-02-17
NBPD5.25C NBPD Confidential  Appendix  U30  -  PI  IR-8f,  8g,  8h  -  Run  Dec  08  Lepreau  Non-Refurbishment  2008-12-06  hour  02  on  2009-02-17
NBPD5.26C NBPD Confidential  Appendix  U31  -  PI  IR-8f,  8g,  8h  -  Summary  of  Genco  Incremental  Energy  cost  to  Replace  Point  Lepreau  Energy
NBPD5.27C NBPD Confidential  Appendix  U32  -  PI  IR-8f,  8g,  8h  -  TSS  Modeling  Guidlines
NBPD5.28C NBPD Confidential  Appendix  U33  -  PI  IR-8f,  8g,  8h  -  TSS  Workbook  8  10  08  h2
NBPD5.29C NBPD Confidential  Appendix  U34  -  PI  IR-8f,  8g,  8h  -  TSS  Workbook  8  10  08  h0
NBPD5.30C NBPD Confidential  Appendix  U35  -  PI  IR-8f,  8g,  8h  -  TSS  Workbook  8  13  08  h8
NBPD5.31C NBPD Confidential  Appendix  U36  -  PI  IR-8f,  8g,  8h  -  TSS  Workbook  8  02  08  h0
NBPD5.32C NBPD Confidential  Appendix  U37  -  PI  IR-8f,  8g,  8h  -  TUCS-Fuel  Price  for  Dec  6,  2008
NBPD5.33C NBPD Confidential  Appendix  U38  -  PI  IR-8f,  8g,  8h  -  TUCS  Unit  Characteristics  for  Dec6,  2008
NBPD5.34C NBPD Confidential  Appendix  V  -  PI  IR-13i  -  Replacement  costs
NBPD5.35C NBPD Confidential  Appendix  W  -  PI  IR-14a  -    Point  Lepreau  Deferral  Mar  29-31,  2001
NBPD5.36C NBPD Blank  Space
NBPD5.37C NBPD Confidential  Appendix  W02  -  PI  IR-14a  -  Point  Lepreau  Deferral  2008  04
NBPD5.38C NBPD Confidential  Appendix  W03  -  PI  IR-14a  -  Point  Lepreau  Deferral  2008  05
NBPD5.39C NBPD Confidential  Appendix  W04  -  PI  IR-14a  -  Point  Lepreau  Deferral  2008  06
NBPD5.40C NBPD Confidential  Appendix  W05  -  PI  Ir-14a  -  Point  Lepreau  Deferral  2008  07
NBPD5.41C NBPD Confidential  Appendix  W06  -  PI  IR-14a  -  Point  Lepreau  Deferral  2008  08
NBPD5.42C NBPD Confidential  Appendix  W07  -  PI  IR-14a  -  Point  Lepreau  Deferral  2008  09
NBPD5.43C NBPD Confidential  Appendix  W08  -  PI  IR-14a  -  Point  Lepreau  Deferral  2008  10
NBPD5.44C NBPD Confidential  Appwndix  09  -  PI  IR-14a  -  Point  Lepreau  Deferral  2008  11
NBPD5.45C NBPD Confidential  Appendix  W10  -  PI  IR-14a  -  Point  Lepreau  Deferral  2008  12
NBPD5.46C NBPD Confidential  Appendix  W11  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  01
NBPD5.47C NBPD Confidential  Appendix  W12  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  02
NBPD5.48C NBPD Confidential  Appendix  W13  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  03
NBPD5.49C NBPD Confidential  Appendix  W14  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  04
NBPD5.50C NBPD Confidential  Appendix  W15  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  05
NBPD5.51C NBPD Confidential  Appendix  W16  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  06
NBPD5.52C NBPD Confidential  Appendix  W17  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  07
NBPD5.53C NBPD Confidential  Appendix  W18  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  08
NBPD5.54C NBPD Confidential  Appendix  W19  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  09
NBPD5.55C NBPD Confidential  Appendix  W20  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  10
NBPD5.56C NBPD Confidential  Appendix  W21  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  11
NBPD5.57C NBPD Confidential  Appendix  W22  -  PI  IR-14a  -  Point  Lepreau  Deferral  2009  12
NBPD5.58C NBPD Confidential  Appendix  W23  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  01
NBPD5.59C NBPD Confidential  Appendix  W24  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  02
NBPD5.60C NBPD Confidential  Appendix  W25  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  03
NBPD5.61C NBPD Confidential  Appendix  W26  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  04
NBPD5.62C NBPD Confidential  Appendix  W27  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  05
NBPD5.63C NBPD Confidential  Appendix  W28  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  06
NBPD5.64C NBPD Confidential  Appendix  W29  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  07
NBPD5.65C NBPD Confidential  Appendix  W30  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  08
NBPD5.66C NBPD Confidential  Appendix  W31  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  09
NBPD5.67C NBPD Confidential  Appendix  W32  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  10
NBPD5.68C NBPD Confidential  Appendix  W33  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  11
NBPD5.69C NBPD Confidential  Appendix  W34  -  PI  IR-14a  -  Point  Lepreau  Deferral  2010  12
NBPD5.70C NBPD Confidential  Appendix  W35  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  01
NBPD5.71C NBPD Confidential  Appendix  W36  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  02
NBPD5.72C NBPD Confidential  Appendix  W37  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  03
NBPD5.73C NBPD Blank  Space
NBPD5.74C NBPD Blank  Space
NBPD5.75C NBPD Blank  Space
NBPD5.76C NBPD Blank  Space
NBPD5.77C NBPD Blank  Space
NBPD5.78C NBPD Blank  Space
NBPD5.79C NBPD Confidential  Appendix  W38  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  04  (Version  5)
NBPD5.80C NBPD Confidential  Appendix  W39  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  04
NBPD5.81C NBPD Confidential  Appendix  W40  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  05
NBPD5.82C NBPD Confidential  Appendix  W41  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  06
NBPD5.83C NBPD Confidential  Appendix  W42  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  07
NBPD5.84C NBPD Confidential  Appendix  W43  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  08
NBPD5.85C NBPD Confidential  Appendix  W44  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  09
NBPD5.86C NBPD Confidential  Appendix  W45  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  10  BeL3
NBPD5.87C NBPD Confidential  Appendix  W46  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  11  BeL3
NBPD5.88C NBPD Confidential  Appendix  W47  -  PI  IR-14a  -  Point  Lepreau  Deferral  2011  12
NBPD5.89C NBPD Confidential  Appendix  W48  -  PI  IR-14a  -  Point  Lepreau  Deferral  2012  01
NBPD5.90C NBPD Confidential  Appendix  W49  -  PI  IR-14a  -  Point  Lepreau  Deferral  2012  02
NBPD5.91C NBPD Confidential  Appendix  W50  -  PI  IR-14a  -  Point  Lepreau  Deferral  2012  03
NBPD5.92C NBPD Confidential  Appendix  W51  -  PI  IR-14a  -  Point  Lepreau  Deferral  2012  04
NBPD5.93C NBPD Confidential  Appendix  W52  -  PI  IR-14a  -  Point  Lepreau  Deferral  2012  05
NBPD5.94C NBPD Confidential  Appendix  W53  -  PI  IR-14a  -  Point  Lepreau  Deferral  2012  06
NBPD5.95 NBPD Appendix  X  -  PI  IR-15  -  Hedging
NBPD6.01 NBPD Response  to  PI  IR-13(h)  Additional  Information
NBPD6.02C NBPD Confidential  Attachment  A  to  PI  IR-13  /  Transaction  Scheduling  System  Program  Switch  for  Dispatch  Control
NBPD6.03C NBPD Confidential  Appendix  Z  -  Modified  Transaction  Scheduling  System  Core  Setup  -  Generation
NBPD6.04C NBPD Confidential  Appendix  AA  -  Modified  Transaction  Scheduling  System  Core  Setup  -  Loads
NBPD6.05C NBPD Confidential  Appendix  AB  -  Modified  Transaction  Scheduling  System  Manual  Adjustment  for  Operations  Requirements  -  Generation
NBPD6.06C NBPD Confidential  Appendix  AC  -  Modified  Transaction  Scheduling  System  Generation  Assignment
NBPD6.07C NBPD Confidential  Appendix  AD  -  Generation  and  Purchase  Assignments
NBPD7.01 NBPD Response  to  PI  IR-1  Additional  Information
NBPD7.02 NBPD Appendix  AE  -  PI  IR-1a  &  b  Additional  Information  -  Capacity  Factor
NBPD7.03 NBPD Response  to  PI  IR-10  a  &b  -  Additional  Information
NBPD7.04 NBPD Response  to  PI  IR-12  a  Additional  information
NBPD7.05 NBPD Appendix  AF  -  PI  IR-12  a  Additional  Information  -  Nuclearco  OMA
NBPD8.01 NBPD Response  to  EUB  IR-18  Additional  Information
NBPD8.02C NBPD Confidential  Appendix  AG  -  Refurb  Contract  /  EUB  IR-18b
NBPD8.03 NBPD Appendix  AG  -  Redacted  Refurb  Contract  /  EUB  IR-18b
NBPD8.04C NBPD Confidential  Appendix  AH  -  Retube  Contract  /  EUB  IR-18b
NBPD8.05 NBPD Appendix  AH  -  Redacted  Retube  Contract  /  EUB  IR-18b
NBPD8.06C NBPD Confidential  Appendix  AI  -  Omnibus  Amending  Agreement  /  EUB  IR-18b
NBPD8.07 NBPD Appendix  AI  -  Redacted  Omnibus  Amending  Agreement  /  EUB  IR-18b
NBPD8.08 NBPD Response  to  PI  IR-14  Additional  Information
NBPD8.09C NBPD Confidential  Appendix  AJ  -  Update  to  Appendix  W  -  Point  Lepreau  Generating  Station  Total  System  Load  2008-09  /  PI  IR-14
NBPD8.10C NBPD Confidential  Appendix  AK  -  Additional  NERA  data  requests  /  PI  IR-14
NBPD9.01 NBPD Response  to  PI  IR-14  -  additional  NERA  information
NBPD9.02C NBPD Confidential  Appendix  AL  -  Additional  NERA  data  (PI  IR-14)
NBPD10.01 NBPD Response  to  PI  IR-12  a  -  Additional  Information
NBPD10.02 NBPD Appendix  AM  -  PI  IR-12  a  -  Additional  detailed  Info  -  Nuclearco  OMA
NBPD11.01C NBPD Confidential  Appendix  T-6  (PI  IR-8)  2008-09  -  PROMOD  Input/Output
NBPD12.01 NBPD Redacted  Rebuttal  Evidence  -  James  E.  Sustman
NBPD12.02C NBPD Confidential  Rebuttal  Evidence  -  James  E.  Sustman
NBPD13.01 NBPD CV  -  D.  Murphy  (  NB  Power)
NBPD13.02 NBPD CV  -  J.  Good  (NB  Power)
NBPD13.03 NBPD CV  -  P.  Pasquet  (NB  Power)
NBPD13.04 NBPD CV  -  J.  Sustman  (Ventyx,  Inc.)
NBPD13.05 NBPD CV  -  K.  Dumaresque  (Deloitte  Touche  LLP)
NBPD13.06 NBPD CV  -  S.  Lund  (Deloitte  Touche  LLP)
NBPD13.07 NBPD CV  -  C.  Francoeur  (Ernst  &  Young)
NBPD13.08 NBPD CV  -  M.  Haycox  (Ernst  &  Young)
NBPD14.01 NBPD Response  to  EUB  -  IR  19,  20  and  21
NBPD14.02C NBPD Confidential  Response  to  EUB  IR-19
NBPD14.03C NBPD Appendix  AN  -  EUB  IR-21a  (June  2008)
NBPD14.04C NBPD Appendix  AO  -  EUB  IR-21a  (July  2008)
NBPD14.05C NBPD Appendix  AP  -  EUB  IR  -  21a  (August  2008)
NBPD14.06C NBPD Appendix  AQ  -  EUB  IR  -  21a  (September  2008)
NBPD14.07C NBPD Appendix  AR  -  EUB  IR-21a  (October  2008)
NBPD14.08C NBPD Appendix  AS  -  EUB  IR-21a  (November  2008)
NBPD14.09C NBPD Appendix  AT  -  EUB  IR-21a  (December  2008)
NBPD14.10C NBPD Appendix  AU  -  EUB  IR-21a  (January  2009)
NBPD14.11C NBPD Appendix  AV  -  EUB  IR-21a  (February  2009)
NBPD14.12C NBPD Appendix  AW  -  EUB  IR-21a  (March  2009)
NBPD14.13C NBPD Appendix  AX  -  EUB  IR  21a  (August  2009)
NBPD14.14C NBPD Appendix  AY  -  EUB  IR-21a  (September  2009)
NBPD14.15C NBPD Appendix  AZ  -  EUB  IR-21a  (October  2009)
NBPD14.16C NBPD Appendix  BA  -  EUB  IR-21a  (November  2009)
NBPD14.17C NBPD Appendix  BB  -  EUB  IR-21a  (January  2011)
NBPD14.18C NBPD Appendix  BC  -  EUB  IR-21a  (February  2011)
NBPD14.19C NBPD Appendix  BD  -  EUB  IR  21b
NBPD14.20 NBPD Response  to  PI  -  IR  23  -  40
NBPD14.21C NBPD Confidential  Response  to  PI  iR-26,  27,  33,  35  &  39
NBPD14.22C NBPD Appendix  BE  -  PI  IR-35B
NBPD14.23C NBPD Appendix  BF  -  PI  IR-36A
NBPD14.24C NBPD Appendix  BG  -  PI  IR-36B
NBPD14.25C NBPD Appendix  BH  -  PI  IR-39F
NBPD14.26C NBPD Appendix  BI  -  PI  IR-39H(i)
NBPD15.01 NBPD Redacted  Response  to  PI  IR-39  G  (iv)
NBPD15.02C NBPD Confidential  Response  to  PI  IR-39  G  (iv)
NBPD15.03C NBPD Appendix  BJ  PI  IR-39  G  (iv)
NBPD15.04C NBPD Appendix  BK  PI  IR-39  G  (iv)  excerpt
NBPD16.01 NBPD Revised  Appendix  Q  -  2  PI  IR-5(b)  Exh  1  09  exp
NBPD16.02 NBPD Revised  Redacted  Rebuttal  Evidence  of  James  Sustman  Jan  09  2013
NBPD16.03C NBPD Revised  Rebuttal  Evidence  of  James  Sustman  Jan  09  2013
NBPD16.04C NBPD Revised  Appendix  AT-EUB  IR  21b  December  2008
NBPD17.01 NBPD Response  to  Undertaking  1  -  Updated  Table  A
NBPD18.01 NBPD Response  to  Undertaking  2  -  Actual  Capital  Cost
NBPD18.02 NBPD Response  to  Undertaking  2  -  Attachment  -  List  of  Assets  being  Amortized
NBPD19.01 NBPD Response  to  Undertaking  5  -  Extension  of  the  Plant
NBPD20.01 NBPD Response  to  Undertaking  6  -  Reports
NBPD20.02 NBPD Response  to  Undertaking  6  -  Report  -  Installation  of  Wear
NBPD20.03 NBPD Response  to  Undertaking  6  -  RL  Cloud  Report
NBPD21.01 NBPD Response  to  Undertaking  8  -  Nuclear  Stabilization  Capacity
NBPD22.01 NBPD Response  to  Undertaking  7  -  Studies
NBPD22.02C NBPD Confidential  Response  to  Undertaking  7  -  Plant  life  Management  Report
NBPD22.03C NBPD Confidential  Response  to  Undertaking  7  -  Condition  Assessment  Report
NBPD23.01 NBPD Response  to  Undertaking  4  -  Inspection  and  Maintenance  Activities
NBPD23.02 NBPD Response  to  Undertaking  4  -  Attachment  -  Reactor  Bdg  Dome  repairs
NBPD23.03 NBPD Response  to  Undertaking  4  -  Additional  Info
NBPD23.04 NBPD Attachment:  Reactor  Building  Management  Plan
NBPD24.01 NBPD Response  to  Undertaking  #  10
NBPD24.02 NBPD Response  to  Undertaking  10  -  Attachment  -  Deloitte  letter  of  engagement  for  2009
NBPD24.03 NBPD Response  to  Undertaking  10  -  Attachment  -  Deloitte  letter  of  engagement  for  2010
NBPD24.04 NBPD Response  to  Undertaking  10  -  Attachment  -  Deloitte  letter  of  engagement  for  2011
NBPD25.01 NBPD Response  to  Undertaking  9
NBPD25.02 NBPD Attachment:  Ernst  and  Young  PLGS  Refurb  Monitoring  report  FY2008-09
NBPD25.03 NBPD Attachment:  Ernst  and  Young  PLGS  Refurb  Monitoring  report  FY2009-10
NBPD25.04 NBPD Attachment:  Ernst  and  Young  PLGS  Refurb  Monitoring  report  Q1  FY2010-11
NBPD25.05 NBPD Attachment:  Ernst  and  Young  PLGS  Refurb  Monitoring  report  Q2-Q4  FY2010-11
NBPD25.06 NBPD Attachment:  Ernst  and  Young  PLGS  Refurb  Monitoring  report  FY2011-12
NBPD25.07 NBPD Attachment:  Ernst  and  Young  PLGS  Refurb  Monitoring  report  FY2012-13
NBPD26.01 NBPD NBPD  Undertaking  #4  -  Reactor  building  dome  and  ring  beam  concrete  repairs.
NBPD27.01 NBPD NBPD  Evidence  -  Part  C  &  D:    Introduction  -  Financing  Costs  and  Amortization  Methodology  -  English
NBPD27.02 NBPD NBPD  Evidence  -  Part  C  &  D:    Introduction  -  Financing  Costs  and  Amortization  Methodology  French  /  Introduction:    méthodologie  à  utiliser  pour  coûts  de  financement  et  amortissement
NBPD27.03 NBPD Attachment  1  -  Part  C  &  D:    Recovery  of  Deferral  Balance  in  charges,  rates  and  tolls  -  English
NBPD27.04 NBPD Attachment  1  -  Part  C  &  D  -  Recovery  of  Deferral  Balance  in  charges,  rates  &  tolls  -  French  /  Récupération  du  solde  de  report  en  frais,  en  tarifs  et  en  charges
NBPD27.05 NBPD NBPD  Evidence  -  Part  C  &  D:    Expert  Report  by  Elenchus  -  Options  for  the  Recovery  of  the  Point  Lepreau  Nuclear  Generating  Station  Deferral  Account  Balance  -  May  2013
NBPD28.01 NBPD NBPD  Evidence  -  Part  C  &  D:    Expert  Report  by  Elenchus  -  Options  for  the  Recovery  of  the  Point  Lepreau  Nuclear  Generating  Station  Deferral  Account  Balance  -  Revised  June  7,  2013
NBPD29.01 NBPD NB  Power  Evidence  -  Erratum  amending  Exhibit  27.03  (pages  10,  11  and  12):    Attachment  1  -  Recovery  of  Deferral  Balance  in  Charges,  Rates  and  Tolls  English
NBPD29.02 NBPD NB  Power  Evidence  -  Erratum  amending  Exhibit  27.04  (pages  12,  13  &  15):    Attachment  1  -  Recovery  of  Deferral  Balance  in  Charges,  Rates  and  Tolls  French  -  Récupération  du  solde  de  report  en  frais,  en  tarifs  et  en  charges
NBPD30.01 NBPD Responses  to  IRs  of  EUB  July  4,  2013  (IR  1-28)
NBPD30.02 NBPD Appendix  -  EUB  IR-1  -  PLGS  Deferral  Calc  Amort  Amt
NBPD30.03 NBPD Appendix  -  EUB  IR-3  -  Depreciation  Schedules
NBPD30.04C NBPD CONFIDENTIAL  -  Appendix  -  EUB  IR  10(a)  -  Fuel  and  Purchase  Power  expense
NBPD30.05C NBPD CONFIDENTIAL  -  Appendix  -  EUB  IR  11(a)  -  Energy  Production
NBPD30.06 NBPD Appendix  -  EUB  IR-16(b)  -  List  of  Capital  Projects
NBPD30.07 NBPD Appendix  -  EUB  IR  -18(a)  -  Bayside  Decommissioning  Layer  1
NBPD30.08 NBPD Appendix  -  EUB  IR-18(a)  -  Bayside  Decommissioning  Layer  2
NBPD30.09 NBPD Appendix  -  EUB  IR-18(a)  -  Belledune  Decommissioning  Layer  1
NBPD30.10 NBPD Appendix  -  EUB  IR-18(a)  -  Belledune  Decommissioning  Layer  2
NBPD30.11 NBPD Appendix  -  EUB  IR-18(a)  -  Belledune  Decommissioning  Layer  3
NBPD30.12 NBPD Appendix  -  EUB  IR-18(a)  -  Courtenay  Bay  Decommissioning  Layer  1
NBPD30.13 NBPD Appendix  -  EUB  IR-18(a)  -  Courtenay  Bay  Decommissioning  Layer  2
NBPD30.14 NBPD Appendix  -  EUB  IR-18(a)  -  Courtenay  Bay  Decommissioning  Layer  3
NBPD30.15 NBPD Appendix  -  EUB  IR-18(a)  -  Coleson  Cove  Decommissioning  Layer  1
NBPD30.16 NBPD Appendix  -  EUB  IR-18(a)  -  Coleson  Cove  Decommissioning  Layer  3
NBPD30.17 NBPD Appendix  -  EUB  IR-18(a)  -  Coleson  Cove  Decommissioning  Layer  4
NBPD30.18 NBPD Appendix  -  EUB  IR-18(a)  -  Dalhousie  Decommissioning  Layer  1
NBPD30.19 NBPD Appendix  -  EUB  IR-18(a)  -  Dalhousie  Decommissioning  Layer  2
NBPD30.20 NBPD Appendix  -  EUB  IR-18(a)  -  Dalhousie  Decommissioning  Layer  3
NBPD30.21 NBPD Appendix  -  EUB  IR-18(a)  -  CICA  ARO  Decommissioning  -  Fire  Road
NBPD30.22 NBPD Appendix  -  EUB  IR-18(a)  -  Grand  Lake  Decommissioning  Layer  5
NBPD30.23 NBPD Appendix  -  EUB  IR-18(a)  -  Grand  Lake  Decommissioning  Layer  6
NBPD30.24 NBPD Appendix  -  EUB  IR-18(a)  -  Grand  Manan  Decommissioning  Layer  1
NBPD30.25 NBPD Appendix  -  EUB  IR-18(a)  -  Grand  Manan  Decommissioning  Layer  2
NBPD30.26 NBPD Appendix  -  EUB  IR-18(a)  -  CICA  ARO  Decommissioning  -  Land  Reclamation
NBPD30.27 NBPD Appendix  -  EUB  IR-18(a)  -  Millbank  Decommissioning  Layer  1
NBPD30.28 NBPD Appendix  -  EUB  IR-18(a)  -  Millbank  Decommissioning  Layer  2
NBPD30.29 NBPD Appendix  -  EUB  IR-18(a)  -  Nuclear  Decommissioning  Liability
NBPD30.30 NBPD Appendix  -  EUB  IR-18(a)  -  Ste  Rose  Decommissioning  Layer  1
NBPD30.31 NBPD Appendix  -  EUB  IR-18(a)  -  Ste  Rose  Decommissioning  Layer  2
NBPD30.32 NBPD Appendix  -  EUB  IR-18(a)  -  Summary  of  Genco  Decommissioning  Expenses
NBPD30.33 NBPD Appendix  -  EUB  IR-18(a)  -  Summary  of  UFM  Liability  Calculations
NBPD30.34 NBPD Appendix  A  -  EUB  IR-18(b)  -  APM  Cost  Estimate  -  November  2011
NBPD30.35 NBPD Appendix  B  -  EUB  IR-18(b)  -  APM  Cost  Estimate  -  Summary  Report  -  October  2011
NBPD30.36 NBPD Appendix  C  -  EUB  IR-18(b)  -  APM  Cost  Estimate  -  Input  -  October  2011
NBPD30.37 NBPD Appendix  D-  EUB  IR-18(b)  Lifecycle  Cost  and  Schedule  Report  August  2011
NBPD30.38 NBPD Appendix  E-  EUB  IR-18(b)  Estimate-Used  Fuel  Transp.  August  2011
NBPD30.39 NBPD Appendix  F  EUB-IR  18(b)  Technical  Assessment  February  2012
NBPD30.40 NBPD Appendix  G  EUB-IR  18(b)  Decommissioning  Study  2012  CCove  Part  I
NBPD30.41 NBPD Appendix  H  EUB  IR  18(b)  Decommissioning  Study  2012  CCove  Part  2
NBPD30.42 NBPD Appendix  I  EUB  IR-18(b)  Decommissioning  Study  2012  CCove  Part  3
NBPD30.43 NBPD Appendix  J  EUB-IR  18(b)  Decommissioning  Study  2012  CCove  Part  4
NBPD30.44 NBPD Appendix  K  EUB  IR  18(b)  Decommissioning  Study  2012  CCove  Part  5
NBPD30.45 NBPD Appendix  L  EUB  IR  18  (b)  Decommissioning  Study  2012  CCove  Part  6
NBPD30.46 NBPD Appendix  M  EUB  IR  18(b)  Decommissioning  Study  2012  CCove  Part  7
NBPD30.47 NBPD Appendix  N  EUB  IR  18(b)  Decommissioning  Plan  2011  Dalhousie  Part  1
NBPD30.48 NBPD Appendix  O  EUB  IR  18(b)  Decommissioning  Plan  2011  Dalhousie  Part  2
NBPD30.49 NBPD Appendix  P  EUB  IR  18(b)  Decommissioning  Plan  2011  Dalhousie  Part  3
NBPD30.50 NBPD Appendix  Q  EUB  IR  18(b)  Decommissioning  Plan  2011  Dalhousie  Part  4
NBPD30.51 NBPD Appendix  R  EUB  1R  18(b)  Decommissioning  Plan  2010  Pt  Lepreau  Part  1
NBPD30.52 NBPD Appendix  S  EUB  IR  18(b)  Decommissioning  Plan  2010  Pt  Lepreau  Part  2
NBPD30.53 NBPD Appendix  T  EUB  IR  18(b)  Decommissioning  Plan  2010  Pt  Lepreau  Part  3
NBPD30.54 NBPD Appendix  EUB  IR  21(b)  Proof  of  Revenue  2013-2014
NBPD30.55 NBPD Appendix  U  EUB  IR  24(b)  Budget  Load  Forecasts
NBPD30.56 NBPD Appendix  EUB  IR-25  Lepreau  Deferral  Amortiz.  Schedule
NBPD30.57 NBPD Appendix  EUB  IR-28(a)    Lepreau  Amortiz  Schedule
NBPD30.58 NBPD Responses  to  IRs  of  the  Public  Intervenor  July  4,  2013  (IR  1-17)
NBPD30.59 NBPD Appendix  -  PI  IR  3(b)  -  NB  Power  Long-Term  Debt  2013/14
NBPD30.60 NBPD Appendix  -  PI  IR  9(a)  -  Revenue  Forecast  and  Actuals
NBPD30.61 NBPD Appendix  -  PI  IR  9(b)  -  Revenue  Forecast  and  Actuals  2013-2014
NBPD30.62 NBPD Appendix  -  PI  IR  (9c)  -  Proof  of  Revenue  Analysis
NBPD30.63 NBPD Appendix  -  PI  IR  16(b)  -  List  of  Projects  under  Construction
NBPD30.64 NBPD Appendix  V-  PI  IR  16(e)  -  NB  Power  Group  Accounting  Policy
NBPD31.01 NBPD Responses  to  IRs  of  EUB  August  7,  2013  (Round  2)
NBPD31.02 NBPD Responses  to  IRs  of  EUB  -  Appendix  A  NBP  HR  Policies  (HR-10  and  HR-11)  (IR-34)
NBPD31.03 NBPD Responses  to  IRs  of  EUB  August  7,  2013  Depreciation  Schedules  (IR-38)
NBPD31.04C NBPD Confidential  Responses  to  IRs  of  EUB  August  7,  2013  (IR-39)
NBPD31.05 NBPD Responses  to  IRs  of  PI  August  7,  2013  -  Round  2
NBPD31.06C NBPD Confidential  Responses  to  IRs  of  PI  August  7,  2013  (IR-22)
NBPD31.07C NBPD Confidential  Responses  to  IRs  of  PI  August  7,  2013  (IR-23)
NBPD32.01 NBPD Response  to  PI  IR-22d  Updated
NBPD33.01 NBPD Response  to  PI  IR-22d  Supplemental
NBPD33.02C NBPD Response  to  PI  IR-22d  Supplemental  Tables  2(a)  and  2(b)  CONFIDENTIAL
NBPD34.01 NBPD CV  -  Darren  Murphy  (NB  Power)
NBPD34.02 NBPD CV  -  Caroline  Collyer  (NB  Power)
NBPD34.03 NBPD CV  -  Jonathan  Dobson  (NB  Power)
NBPD34.04 NBPD CV  -  John  Todd  (Elenchus)
NBPD35.01 NBPD Response  to  EUB  IR-30  UPDATE
NBPD36.01 NBPD Correction  to  Exhibit  30.63  PI  IR-16b,  July  4,2013
NBPD37.01 NBPD Response  to  Undertaking  1
NBPD37.02 NBPD Response  to  Undertaking  2
NBPD37.03 NBPD Response  to  Undertaking  3
PI1.01C PI Confidential  Evidence  of  Kurt  G.  Strunk
PI1.02 PI CV  of  Kurt  G.  Strunk
PI1.03 PI Redacted  evidence  of  Kurt  G.  Strunk
PI2.01C PI Condidential  Responses  to  IRs  of  NBPD
PI2.02C PI Confidential  Responses  to  IRs  of  NBEUB
PI2.03C PI Confidential  Response  to  NBPD  IR-3  (excel)
PI2.04C PI Confidential  Responses  to  NBPD  IR-3  (mdb  access  data  base)
PI2.05 PI Redacted  Responses  to  IRs  of  NBPD
PI2.06 PI Redacted  Responses  to  IRs  of  NBEUB
PI3.01 PI Submission  of  NB  Power  March  2012
PI4.01C PI Graphs  of  Actual  &  Modified  TSS  -  Belledune  Sept  5-7,  2009
PI4.02C PI Historical  Operation  Data  (no  PLGS)
PI5.01 PI Evidence  of  Robert  D.  Knecht
PI6.01 PI Responses  to  IRs  of  NBPD
PI6.02 PI Responses  to  IRs  of  NBEUB
PI6.03 PI Attachment  -  EUB  IR-2
PI7.01 PI Revenue  Forecasts  and  Actuals  by  Customer  Class  2005/06  to  2012/13
PI7.02 PI NB  Power  Group  Revenue  Requirements    Fiscal  Year  2013/14  Budget
Transcripts
Date Witness
10/22/2013 Transcript - Part C & D - Hearing Day 2
10/21/2013 Transcript - Part C & D - Hearing Day 1
10/21/2013Transcript - Part C & D - Hearing Day 1 (In-Camera) CONFIDENTIAL
10/21/2013 Transcript - Part C & D - Hearing Day 1 (In-Camera) - Redacted
10/21/2013 Redacted In-Camera Transcript
04/16/2013 Transcript - Procedure Conference Re Part C & D
01/16/2013 Transcript - Hearing Day 5
01/15/2013In Camera Transcript - Hearing day 4
01/15/2013 Transcript - Hearing Day 4
01/15/2013 Transcript In Camera Jan 15, 2013 - Redacted Jan 21, 2013
01/14/2013 Hearing day 3
01/11/2013 Hearing day 2
01/11/2013In Camera Transcript - Hearing Day 2
01/11/2013 Transcript In Camera Jan 11, 2013 - Redacted Jan 21, 2013
01/10/2013 Hearing Day 1
11/20/2012Recording Only - Motion Hearing Not Transcribed
11/05/2012 Motions day
11/05/2012In Camera Transcript
10/29/2012 Motions Day - re confidentiality undertaking and revised schedule
06/18/2012 Pre-Hearing
03/13/2012 Procedural conference March 13, 2012
Other  Relevant  Documents
Title Date
Letter  from  NBP  re  Filing  of  Updated  Response  to  EUB  IR-30 10/18/2013
Email  from  NB  Power  re.  Witness  Panels  for  Hearing  commencing  October  21,2013 10/17/2013
Board  Email  to  Registered  Parties  re.  Update  to  List  of  Registered  Parties 10/17/2013
Board  email  to  Registered  Parties  re.  Confirmation  of  Hearing  Date 10/04/2013
Letter  from  NBP  re.  No  Filing  of  Notice  of  Motion 10/03/2013
Letter  from  NBP  re.  No  Filing  of  Rebuttal  Evidence  on  October  18,  2013 10/03/2013
Board  email  to  Registered  Parties  re.  No  Motions  Day  on  October  4,  2013 10/03/2013
Letter  from  Public  Intervenor  re.  PI  IR-22(d) 09/26/2013
IRs  of  NB  Power  to  the  Public  Intervenor 09/17/2013
IRs  of  EUB  Staff  to  the  Public  Intervenor 09/17/2013
Master  List  of  Filing  Documents  filed  by  PI 09/10/2013
Letter  from  PI  advising  the  Board  that  they  don't  require  a  Motion  on  August  12,  2013 08/09/2013
Letter  from  NB  Power  re.  Filing  of  Responses  to  IRs  -  Round  2 08/07/2013
Master  List  of  documents  being  filed  by  PI  -  IRs  to  NB  Power  -  Round  2 07/23/2013
IRs  of  the  PI  to  NB  Power  -  Round  2 07/23/2013
IR's  of  NBEUB  Staff  to  NB  Power  -  Round  2 07/23/2013
Letter  from  PI  Re:  No  Filing  of  Motion 07/08/2013
NB  Power  letter  re.  Filing  of  Erratum  to  Exhibits  27.03  (Eng.)  and  27.04  (French):    Attachment  1  -  Recovery  of  Deferral  Balance  in  Charges,  Rates  &  Tolls  /  Récupération  du  solde  de  report  en  frais,  en  tarifs  et  en  charges 07/04/2013
Letter  from  NB  Power  re.  Filing  of  Responses  to  IRs  -  Round  1 07/04/2013
Master  List  of  Documents  being  filed  -  Responses  to  IRs  -  Round  1 07/04/2013
IRs  of  EUB  Staff  to  NB  Power  June  11,  2013 06/11/2013
IRs  of  PI  to  NB  Power  June  11,  2013 06/11/2013
Attachment  to  the  PI-  IRs  (NB  Power  Revenue  Forecasts  and  Actuals  2005-2013) 06/11/2013
Attachment  to  the  PI-IRs  (NB  Power  Revenue  Forecasts  and  Actuals  2013-2014) 06/11/2013
Letter  from  NBP  re.  Filing  of  Evidence  -  Part  C  &  D 06/07/2013
NBP  -  Master  List  of  Documents  being  filed  -  Part  C  &  D 06/07/2013
NBP  -  Master  List  of  Documents  being  filed  -  Part  C  &  D 05/28/2013
Letter  from  NBP  re.  Filing  of  Evidence  -  Part  C  &  D 05/28/2013
Board  email  to  all  parties  advising  that  a  motions  day  is  not  required  and  the  Hearing  is  cancelled  fo  rApril  19,  2013 04/17/2013
Coordinates  List  Revised  April  16,  2013 04/16/2013
Filing  Schedule  with  correction  to  hearing  date 04/16/2013
Letter  from  NB  Power  concerning  issues  to  address  at  the  procedure  conference 04/12/2013
Public  Intervenor  suggested  timeline  for  discussion  at  the  procedure  conference 04/12/2013
Email  to  Phil  Regarding  the  Procedural  Conference 03/27/2013
Board  Email  to  parties  re  procedural  conference  April  16,  2013  -  Issues  C  &  D 03/26/2013
ID  -  5  Changes  in  Position  by  NB  Power,  submitted  by  R.  Basque  in  aide  to  his  final  argument 01/16/2013
Final  Argument  of  R.  Basque  /  Public  Intervenor 01/16/2013
ID  -  2  C  -  Confidential  table  submitted  by  John  Furey 01/15/2013
ID  -  3C  -  Confidential  -  In  Province  load,  total  generation  comparison  between  Belledune  &  Dalhousie,  submitted  by  John  Furey 01/15/2013
ID  -  4  C  -  Confidential  Graph,  submitted  by  John  Furey 01/15/2013
Opening  Statement  of  Kurt  Strunk 01/14/2013
ID-1  -  High  Risks  -  Submitted  by  E.  Desmond 01/10/2013
Letter  from  NB  Power  concerning  additional  documents  being  filed 01/09/2013
Master  list  of  documents  being  filed 01/09/2013
Letter  from  NB  Power  concerning  responses  to  Rebuttal  IRs. 01/08/2013
Master  list  of  documents  filed 01/08/2013
Email  from  Monica  Johnson  concerning  Witness  K.  Strunk  as  expert  witness 01/07/2013
Public  Intervenor  Revised  Redacted  IRs  on  Rebuttal  Evidence 01/04/2013
Public  Intervenor  Confidential  IRs  on  Rebuttal  Evidence 01/04/2013
EUB  IRs  on  Rebuttal  Evidence 01/03/2013
NB  Power  email  concerning  witness  panels 01/03/2013
Letter  from  NB  Power  concerning  the  filing  of  Rebuttal  Evidence 12/21/2012
Master  list  of  filing  documents  December  21,  2012 12/21/2012
Public  Intervenor  Master  list  of  filing  documents  December  10,  2012 12/10/2012
IRs  of  NB  Power  Disco  to  the  Public  Intervenor 12/03/2012
IRs  of  EUB  to  the  Public  Intervenor 12/03/2012
Letter  from  NB  Power  concerning  confidential  response  to  PI  IR-8  PROMOD  Report 12/03/2012
Master  List  of  filing  documents  December  3,  2012 12/03/2012
Letter  from  NB  Power  concerning  IRs  to  evidence  of  Public  Intervenor 12/03/2012
Interrogatories  of  NB  Power  to  evidence  of  Public  Intervenor 12/03/2012
Interrogatories  of  EUB  to  evidence  of  Public  Intervenor 12/03/2012
NB  Power  letter  concerning  IRs  to  Public  Intervenor    Evidence  and  their  intent  to  file  rebuttal  Evidence 12/03/2012
Letter  from  the  Public  Intervenor  concerning  filing  of  Strunk  Evidence 11/26/2012
Public  Intervenor  Master  list  of  documents  -  November  26,  2012 11/26/2012
Filing  Schedule  Revised  -  November  20,  2012 11/20/2012
NB  Power  letter  concerning  submission  of  additional  responses 11/20/2012
Master  list  of  filing  document  -  November  20,  2012 11/20/2012
Letter  from  the  Public  Intervenor  requesting  a  delay  in  the  filing  of  Intervenor  evidence 11/19/2012
Board  Email  to  Parties  concerning  conference  call  scheduled  to  consider  the  Public  Intervenor  request  for  delay  to  file  intervenor  evidence 11/19/2012
Letter  from  NB  Power  concerning  additional  information  being  filed 11/19/2012
Master  list  of  documents  being  filed  November  19,  2012 11/19/2012
Board  email  to  all  parties  confirming  Hearing  Nov.  20,  2012  concerning  documents  NBPD  8.03  &  8.07 11/16/2012
Board  email  to  all  parties  to  advise  it  will  not  be  necessary  for  the  Board  to  hold  a  hearing  on  Nov  20,  2012 11/16/2012
Revised  Board  email  to  all  parties    to  advise  it  will  not  be  necessary  for  the  Board  to  hold  a  hearing  on  Nov  20,  2012  (correction  to  exhibit  numbers  in  question) 11/16/2012
Notice  of  Motion  from  Public  Intervenor 11/16/2012
Board  email  to  parties  to  schedule  a  conference  call  for  Public  Intervenor  request  for  delay  in  filing  Evdence 11/16/2012
Board  email  to  all  parties  requesting  Andrew  Logan  be  added  to  the  email  distribution  list 11/15/2012
Email  from  NBPower  concerning  additional  responses  noted  in  Master  filing  list  part  2 11/08/2012
Master  list  of  Attachments  filed  Part  2 11/08/2012
letter  from  NB  Power  concerning  Additional  Responses 11/08/2012
Master  list  of  attachments  filed 11/08/2012
Email  from  NB  Power  to  all  parties  to  request  a  conference  call 11/07/2012
Email  from  NB  Power  to  all  paties  confirming  the  time  of  the  conference  call 11/07/2012
Public  Intervenor  Notice  of  Motion 11/02/2012
Motion  by  Staff  of  EUB 11/02/2012
Confidentiality  Undertaking  Agreement  form  approved  by  the  Board  on  October  29,  2012 10/29/2012
Revised  Filing  Schedule  approved  by  the  Board  October  29,  2012 10/29/2012
Public  Intervenor  Notice  of  Motion 10/26/2012
Board  email  to  all  Parties  confirming  Motions  day  Oct  29,  2012 10/26/2012
Letter  from  R.  Basque  requesting  delay  of  Motions  day 10/25/2012
Board  email  to  Parties,  scheduling  a  conference  call  to  discuss  the  issues  raised  in  the  Public  Intervenor  letter  of  this  date. 10/25/2012
Board  email  to  Parties  attaching  a  recent  Confidentiality-Non-  Disclosure  Agreement  as  a  template 10/25/2012
Attachment  to  Oct  25  Board  email  to  all  parties  "Confidentiality/Non  Disclosure  Agreement"  template 10/25/2012
Letter  from  NB  Power  concerning  Responses  to  IRs 10/24/2012
Board  email  to  all  parties  to  request  David  Coon  be  added  to  global  email  list. 10/23/2012
IR  of  EUB  to  NB  Power  Distribution 10/12/2012
IR  of  PI  to  NB  Power  Distribution 10/12/2012
Letter  from  R.  Basque  in  response  to  the  NBP  letter  of  October  5,  2012 10/11/2012
NB  Power  letter  (English)  concerning  Evidence  on  Plant  operating  life 10/05/2012
NB  Power  Letter  (French)  concerning  Evidence  on  plant  operating  life 10/05/2012
NB  Power  letter  in  response  to  the  Public  Intervenor  letter  of  October  2,  2012 10/05/2012
Public  Intervenor  letter  concerning  Audit  report  of  J.  Sustman  of  Ventyx 10/02/2012
Letter  from  NB  Power  concerning  the  filing  of  Exper  Evidence  of  Mr.  James  Sustman 09/27/2012
NB  Power  response  to  letter  from  the  Public  Intervenor  concerning  the  amount  that  should  be  in  the  PLGS  Deferral  Account  Balance 09/19/2012
Letter  from  R.  Basque/  Public  Intervenor  to  J.  Furey  cc:  all  parties  concerning  clarity  to  assist  in  preparing  IRs. 09/14/2012
English  Letter  from  NB  Power  concerning  evidence 09/11/2012
French  letter  from  NB  Power  concerning  evidence 09/11/2012
Board  letter  to  all  parties  concerning  extension  to  file  additional  expert  evidence 08/24/2012
Letter  from  NB  Distribution  Corporation  concerning  request  for  delay  to  file  expert  evidence 08/24/2012
Letter  from  the  Public  Intervenor  concerning  NB  Power  and  the  filing  schedule 08/24/2012
Letter  from  the  Public  Intervenor  in  response  to  NB  Power's  letter  of  August  20,  2012 08/22/2012
Letter  from  Disco  requesting  delay  in  filing  add  evidence  re  bal  in  def  acct 08/20/2012
Letter  from  the  Public  Intervenor  in  response  to  the  Board's  August  1,  2012  letter 08/13/2012
Letter  from  Disco  re  Logan  report 08/02/2012
Board  letter  to  R.  Basque  cc  all  parties  concerning  2002  hearing  documents 08/01/2012
Attachment  to  Board  letter  to  R.  Basque  -  Confidential  Exhibit  list  2002-002-08-01 08/01/2012
Attachment  to  Board  letter  to  R.  Basque  -  Exhibit  list  2002-002-08-01 08/01/2012
Attachment  to  Board  letter  to  R.  Basque  -  Documents  marked  for  identification2002-002-02-05 08/01/2012
Board  letter  to  all  parties  re  Logan  report 08/01/2012
Letter  from  J.  Furey  to  R.  Basque  re  providing  2002  hearing  documents 07/27/2012
Signed  Order-English  with  MFR  and  Filing  Schedule 07/18/2012
Signed  Order-French-with  MFR  and  Filing  Schedule 07/18/2012
Response  of  DISCO  to  TSD  report 07/11/2012
Response  of  PI  to  TSD  report 07/11/2012
Teed  Saunders  Doyle  Suggested  Terms  of  Reference  for  Lepreau  Deferral  Account  Review 07/06/2012
Board  email  to  all  Parties  in  connection  with  the  Technical  session  on  June  8,  2012 06/06/2012
Order  -  English  /  Re:  Pre-Hearing  Conference  and  Technical  session 05/10/2012
Notice  -  English  /  Re:  Pre-Hearing  &  Technical  Conference 05/10/2012
Order  -  French  /  Re:  Pre-Hearing  &  Technical  Conference 05/10/2012
Notice  -  French  /  Re:  Pre-Hearing  &  Technical  Conference 05/10/2012
Submission  of  the  Public  Intervenor 03/30/2012
Submission  of  Disco  dated  March  14,  2012 03/15/2012
Notice  -  English  /  Re:  Initial  Procedure  Conference 02/13/2012
Notice  -  French  /  Re:  Initial  Procedure  Conference 02/13/2012